Home › Knowledge › Projects

🔧 Projects

Building Your Own Greenhouse: Planning, Foundation & Construction

3 min read · Season: Year-round · June 25, 2026

Building Your Own Greenhouse: Planning, Foundation & Construction

Your own greenhouse extends the growing season by weeks, protects sensitive plants from frost and moisture, and allows you to raise heat-loving crops like tomatoes, peppers and cucumbers. With the right planning, it's manageable even for beginners.

Which Greenhouse Suits You?

By Material

  • Aluminum greenhouse – lightweight, rust-free, affordable (from €300), good kits available
  • Wooden greenhouse – visually appealing, good insulation, needs regular maintenance
  • Polytunnel – cheapest option (from €50), not permanent, ideal for beginners

By Glazing

  • Single glass – cheap, high light transmission, risk of breakage
  • Twin-wall polycarbonate sheets – shatterproof, good insulation, slightly yellowish, ideal for beginners
  • Toughened glass (tempered safety glass) – expensive, but durable and clear

Choosing a Location

  • South-facing – at least 6 hours of sun daily
  • Wind protection at the back (hedge, fence, house wall) – but without casting shade
  • Water connection nearby
  • Level ground – or plan for terracing
  • Minimum distance to property lines: 1–3 m depending on the state (check with the building authority)

Foundation – The Decisive Base

Point Foundation (Simple)

For smaller greenhouses up to ~15 m². Concrete posts or ground sleeves set in concrete at the corners and midpoints. Affordable and sufficiently stable.

Strip Foundation (Solid)

Continuous concrete foundation (~20 cm deep, 20 cm wide). For large greenhouses or soft ground. Durable and frost-proof.

No Foundation

Only suitable for temporary polytunnels. Ground screws or earth anchors are sufficient.

Setup Step by Step

  1. Mark out and level the area – set up string lines, remove/add soil until everything is level
  2. Set the foundation – dig holes, set sleeves/posts in concrete, let cure (at least 3 days)
  3. Erect the frame – kits usually come with instructions; align corners exactly at 90°
  4. Assemble the roof structure – attach rafters and ridge, check roof pitch (30–35° optimal)
  5. Install the glazing – fit panels from bottom to top, secure with clips or rubber profiles
  6. Door and vent windows – plan for at least one roof window for natural convection

Interior Fittings

  • Raised beds or beds directly in the ground – refresh soil with compost
  • Shelving for seedling pots – wire shelving along the walls
  • Irrigation system – drip irrigation with a timer saves time daily
  • Thermometer/hygrometer – min-max thermometer to track extremes

Ventilation and Temperature Control

In summer, the greenhouse can reach 60°C+. This kills plants quickly:

  • Roof windows that open automatically via a thermostat opener (from €15)
  • Shade netting on the south side during strong sunlight
  • Supplemental heating in spring: a small electric heater is enough for frost-free nights – only devices suitable for damp rooms; according to the VDE, outdoors only operate them via a residual current device (RCD), and extension cables must be suitable for outdoor use (IP44)

Permits

Whether a greenhouse is permit-free is regulated differently by each state building code – often by enclosed volume rather than floor area, and more strictly outside built-up areas. So check with the local building authority before building, especially near property boundaries.

Sources

The sources support individual statements in this article. The organisations named have neither reviewed nor endorsed it.

This article comes from the Ernterei app. The journal for people who make things themselves: garden, harvest, pantry, recipes and over 140 how-to articles – free for iPhone and Android.